The Quartette - a Million Ounce Gold Mine.

 

With the price of gold hitting an all-time high of over $3,000/oz, there has never been a better time to invest in this historic gold mine.

The Quartette has been out of production for over 100 years - meaning it has been untouched by modern mining methods. Geologists estimate over 80% of the original 1 million oz of gold remain in the mine.

Coarse gold, privately held land, and Nevada’s mining-friendly regulatory environment result in the low cost of recovery of around $700 AISC per equivalent ounce - offering a low cost, high ROI opportunity for investors.

 
 

The Historic Quartette Mine

 

Produced over 131,000 ounces of gold between 1902 & 1913, the most productive in the enormously metal-rich district.

The Quartette Mine has 12 patented claims signed by former President Teddy Roosevelt.

Labor disputes and fire halted operations in 1913. Aside from geological surveys, the mine has been largely untouched ever since.

 

Coarse, Visible Gold

 

The extraordinary surface vein exceeds 1,500 feet strike length, the most pronounced in the area.

Coarse gold allows for gravity separation - lowering the cost of recovery, and increasing ROI for investors.

Visible gold is regularly found, as seen in the image on the right.

 

The Crocker Pit

 

The initial project target is an open pit mine at the Crocker Pit site, with 110,000 recoverable equivalent ounces.

At 3.7g/T gold, the Crocker Pit is a magnificently rich area.

These 800,000 tons of ore are estimated to hold 96,000 oz gold, 96,000 oz silver, 2% lead, and 1% zinc.

All are recoverable by gravity separation, no chemicals required.

All permits secured and active.

Estimated timeline: 3-4 years

 
 

Meet Rebel Mining’s Executive Team

 
 

Meg Bianco, Founder & CEO

 Former corporate executive and turnaround agent with expertise in corporate governance, compliance, HR, financial oversight, and team-building.

 
 

Fraser Smith, PE, SE, President

Co-founder of Las Vegas’s Mendenhall Smith Structural Engineers, which was responsible for building the Strat on the Las Vegas Strip. Fraser brings additional expertise in oil and gas, real estate, project management, and financial oversight.

 
 

Tom McGuire, General Manager & Mine Engineer

3 decades of experience in mine management with multiple successes in improving efficiencies and increasing profits.

 

Investment Opportunity

 Rebel Mining is seeking additional funding of $20,000,000 for Capital Requirements to put the mine into operation.

 Please inquire for technical and drilling project details, financials, and more information about how you can get involved.